|
Q Is a level threshold achievable where properties have been built on the back edge of the pavement and the main entrance opens straight onto the pavement?
A This should be possible, providing care is taken to ensure correct crossfalls and gradients, and that the drainage / channel is correctly installed. Care will also need to be taken on DPC and membrane design. Refurbishment could be more difficult if working to existing paving levels, but is again possible.
|